Tareeq Al-Haq | projects
16201
page-template-default,page,page-id-16201,ajax_fade,page_not_loaded,,qode-theme-ver-6.8,wpb-js-composer js-comp-ver-4.4.4,vc_responsive
 

projects

projects

Create a project through an oil (104) added to four wells squares rules.

Rehabilitation project in Majnon oil filed station.

Building of the Directorate of Education building Qurna district.

Building a medical clinic in the district of Qurna.

Building of large stores in the North Rumaila.

Rehabilitation of Turning Workshop at the Iraqi Drilling Company.

Construction of a heavy mechanical washing equipment for the Iraqi Drilling Company.

The construction of an open-sided shed in the yard towers for Iraqi Drilling Company.

Administration building and the establishment of accounts in a power building of Basra.

Construction of sheds in various sizes and heights in Basra (water injection project West Qurna).

Construction of sheds in various sizes and heights in Basra (water injection project West Qurna).

We have contract with BP in collaboration with the Khora company and the Basra Mas Company to create rules wells.

As we worked on the Maintenance of oil pumping stations in North and South Rumalia.
Thework includes :

Poured concrete, the total volume was 2100 m3 and special pumps 054,055

Withdrawal of waste oil, which caused damage to the 011 tank assembly and carry out maintenance of reservoirs (Sand Plast - Paint - welding).

building a fence of length 4000 m and private stores Rumalia North and build BRC fence at a pumping station OC1.

Underground pipelines and construction of escorts rooms.